Data Centers & Mission Critical

In mission critical, power availability and delivery date are the deal. Everything else is negotiable.

Data center development is a power procurement business first and a construction business second. Available capacity, the utility's interconnection queue, substation timing, and the cost of an upgrade determine whether a site is viable at all — and those answers routinely take longer to obtain than entitlement does.

The rest follows from redundancy and thermal design: concurrent maintainability, generator and UPS topology, cooling approach, and water availability. Long-lead equipment procurement sits squarely on the critical path, so schedule commitments are made against equipment lead times rather than construction duration.

What we build

  • Build-to-suit data centers
  • Powered shell
  • Edge and colocation facilities
  • Enterprise mission critical
  • Network and carrier hotels
  • Disaster recovery facilities
  • Land banking for power-served sites
  • Campus master planning

How we underwrite it

01

Power first

Interconnection queue position, substation timing, and upgrade cost decide viability before any building question is asked.

02

Redundancy and cooling

Concurrent maintainability, generator and UPS topology, cooling approach, and water availability set both cost and tenant fit.

03

Long-lead procurement

Switchgear, generators, and chillers drive the schedule. Delivery dates are committed against lead times, not build duration.

Capabilities we bring

Every one of these is carried in-house by a principal, not referred out.